Mostly biding my time until I can take the bike to DucShop for tuning this October.
The rear axle is fitted but I still had the 20mm bearings in the front wheel. I got the necessary 17mm ones but I'm having a little trouble replicating the second end of the spool shape in the CAD software.
The carbon fiber corse instrument surround was made for a smaller and difficult to find temperature gauge. I had ordered a diamond hole saw to fit the modern 58mm one and today I figured out how to make that hole without mangling the surround.
Take two scrap boards, drill a guide hole in one, sandwich the CF face between the boards, position the new hole, C-clamp the sandwich, and drill the CF. Worked perfectly.
Next up?
Waiting for my carbon fiber fairing brackets to arrive.
Taking the CF nose and tail fairings for paint.
Finishing the wiring.
Welding sensor bungs into the exhaust.